Book a call
← Ancapex Research

HBM and server memory shortage in 2027: what it means for GPU rental prices

Market Intelligence · Data as of 27 November 2026 · Every figure links to its source; analyst estimates are labeled

HBM and server memory for 2027 are short, and the memory makers say so themselves. SK hynix has more than 50% of its 2027 and 2028 capacity under long-term agreements⁠[1], Samsung expects AI demand in 2027 to far exceed industry supply⁠[2], and Micron has contracted the vast majority of its 2027 HBM⁠[3]. Price growth is slowing, and NAND gets cheaper in 2027, estimate (TrendForce)⁠[4][5]. Every current flagship GPU from NVIDIA and AMD carries HBM, so memory keeps new GPU capacity scarce and expensive through 2027, our estimate.

What the memory makers said

Three companies make HBM: SK hynix holds 50% of the market, Samsung 33% and Micron 18%, estimate (Counterpoint, second quarter of 2026)⁠[6]. All three reported between late September and the end of October 2026.

MakerWhat it said
SK hynix
28 October 2026
The long-term agreement volume “secured to date corresponds to more than 50% of total production capacity for 2027 and 2028”, and demand exceeds supply “through 2030”⁠[1]. Its chief executive said of 2027 in July: “We forecast that next year will be the worst year in the industry’s history from the supply perspective” (Reuters, 10 July 2026)⁠[7].
Samsung
29 October 2026
“In 2027, ... increasing AI-driven demand will far exceed the industry supply in comparison with 2026”⁠[2]. On its call it described its 2027 HBM as “effectively sold out”, per TrendForce citing Chosun Biz⁠[8].
Micron
30 September 2026
It has “completed agreements for the vast majority of our calendar 2027 HBM bit supply” and expects memory and storage supply and demand to be “much tighter in calendar 2027 and 2028 than they were in 2026”. Industry DRAM bit shipments grow “in the mid-20s percentage range” in 2026, by its estimate⁠[3].

The other side: price growth is slowing

The shortage is real, but it is no longer growing. HBM, the memory GPUs carry, stays locked; NAND, the part that gets cheaper, is storage.

Why memory reaches the price of GPU capacity

HBM sits inside every current flagship GPU from NVIDIA and AMD. Microsoft’s Maia 300 carries 288 GB of HBM4⁠[14].

For a team that rents GPUs, memory reaches the bill twice: it caps how many new accelerators can be built in 2027, and its cost goes into every server an operator buys. Both show up in the price and the start date of reserved capacity, our estimate.

What to watch

What this means for buyers

HBM for 2027 is largely contracted already⁠[4][8]. In TrendForce’s base case memory gets cheaper only from early 2028; in its bear case prices could start falling in late 2027⁠[11]. Waiting is a bet on the bear case, our estimate.

Method and sources

This page is one part of our review of AI compute supply bottlenecks, which ranks the constraints on AI compute supply now, in 2027 and in 2028. The other two topic pages: AI data center power and CoWoS capacity.

Updated on 26 November 2026: TrendForce’s outlook of 25 November for DRAM contract prices in 2027 and 2028 was added, and the closing line of “What this means for buyers” now follows it: it used to say that cheaper memory waits past 2028. The change is in our corrections log.

Updated on 27 November 2026: TrendForce’s outlook of 27 November was added, a base case with DRAM contract prices falling from early 2028 and a bear case with a fall from late 2027, and the closing line of “What this means for buyers” now follows it: it used to say that waiting through 2027 does not bring cheaper memory. The line that HBM for 2027 is largely contracted now cites TrendForce’s reports, which say so directly. The change is in our corrections log.

Figures in our facts registry were checked against their sources on 27 November 2026. Where only a retelling exists, the page names whose retelling it is. Analyst estimates and press reports carry their author’s name, so they are not mistaken for what the companies themselves said; our own judgment is marked “our estimate”.

Ancapex introduces companies that need reserved GPU capacity to the operators that have it. How we are paid is in our methodology.

Sources

  1. SK hynix: Q3 2026 business results (press release, 28 Oct 2026)
  2. Samsung Electronics Announces Third Quarter 2026 Results (press release, 29 Oct 2026)
  3. Micron Q4 FY26 Prepared Remarks (30 Sep 2026)
  4. TrendForce DRAM Bulletin (18 Nov 2026)
  5. TrendForce: NAND Flash contract prices in Q1 2027 (press release, 19 Nov 2026)
  6. HBM market shares in Q2 2026 by Counterpoint (SamMobile, 3 Sep 2026)
  7. SK Hynix CEO sees worst memory shortage in 2027, demand to outstrip supply beyond 2030 (Reuters in Gulf Times)
  8. Samsung Says HBM Share Matches DRAM Standing as HBM4 Sales Triple (TrendForce, 29 Oct 2026)
  9. Cuts to Chinese CSP Demand Weigh on Price Outlook, Slowing Memory Industry Revenue Growth in 2027 (TrendForce, press release, 25 Nov 2026)
  10. DRAM Demand Concerns Mount, Raising Risk of Contract Price Declines in 2028 (TrendForce, report summary, 25 Nov 2026)
  11. Limited Demand Visibility and Growing Supply Chain Caution Heighten Risk of DRAM Contract Price Declines in 2028 (TrendForce, press release, 27 Nov 2026)
  12. DRAM Prices Seen Rising 20% QoQ in 4Q26 Despite Slower Gains (TrendForce, 20 Oct 2026)
  13. TrendForce: PC DRAM contract prices in Q4 2026 (press release, 11 Nov 2026)
  14. Deep dive into Azure Maia 300 architecture (Microsoft Azure Blog, 12 Oct 2026)
  15. Will the AI spending surge trigger an unprecedented memory chip shortage? (Korea JoongAng Daily)
  16. Micron says the silicon gap between HBM and DDR5 is widening with every generation (Tom's Hardware)
  17. TrendForce: average HBM price in 2027 (press release, 29 Sep 2026)
  18. Samsung, SK hynix memory stockpiles fall below 10 days (Seoul Economic Daily, 7 Sep 2026)