CoWoS capacity 2026 to 2027: TSMC advanced packaging supply and demand
The CoWoS gap is narrowing: the shortfall shrinks from about 20% to about 10% by the end of 2026, estimate (institutional investors, via TrendForce)[1]. 2027 is the test. Demand grows about 80% in one year, estimate (Morgan Stanley, September 2026)[2], while TSMC’s CoWoS capacity is estimated to double over two years, by the end of 2028[3]. The gap stays open in 2027 and is tightest in CoWoS-L, the variant the newest NVIDIA and AMD accelerators use[4], our estimate. Goldman Sachs puts capacity higher, estimate (Goldman Sachs, via TrendForce)[5].
TSMC capacity: the end of 2026 and the end of 2028
- End of 2026: 115,000-140,000 wafers a month, about 130,000 by consensus, estimate (Economic Daily News, TechNews, via TrendForce)[6].
- End of 2028: about 260,000 wafers a month, with the AP7 site and Arizona, estimate (Economic Daily News, via TrendForce, 14 September 2026)[3].
- Goldman Sachs is higher: an average of about 227,500 wafers a month in 2027 and about 290,000 in 2028, estimate (Goldman Sachs, via TrendForce)[5]. These are yearly averages, so they do not compare directly with end-of-year figures.
TSMC itself gives no CoWoS capacity in numbers: on its call for the third quarter of 2026 it described CoWoS only in words[7].
Demand in 2027: the September revision
- CoWoS demand grows from 1.394 million wafers in 2026 to 2.509 million in 2027, about +80%, estimate (Morgan Stanley, September 2026, as retold by cnyes)[2]. Webull retells the same report as 2.59 million[8].
- The summer version had 2.694 million wafers in 2027, +93%, estimate (Morgan Stanley, as retold by AiCoin and KuCoin)[9][10]. The September figure is a cut, not a rise.
- Part of the growth is server CPUs: AMD Venice and NVIDIA Vera have also moved to 2.5D packaging[2][11].
A figure still quoted, 595,000 wafers for NVIDIA or about 60% of 1 million, comes from a Morgan Stanley note of July 2025[12].
Who takes the wafers
CoWoS wafers by customer, estimate (Morgan Stanley, as retold). Retellings of the bank’s reports differ, so each figure names its sources.
| Customer | 2026 | 2027 |
|---|---|---|
| NVIDIA | About 56% of the total[13]; 53.4% per Wccftech[11] | 1.222 million wafers[2], about 49% of the total by our calculation |
| AMD | 130,000[2] | 345,000 in the September version, 530,000 in the summer version; its Venice CPUs grow from 50,000 to 210,000[2][14] |
| Broadcom | About 300,000[14][8]; SemiAnalysis, as retold, gives 215,000[15] | 484,000[14][8] |
| MediaTek | 40,000[14][8] | 180,000[14][8] |
| Marvell | 26,000[2][8] | 90,000 in the September version[2][8] |
CoWoS-L: where the shortage sits
- CoWoS-L is the scarcest variant. NVIDIA and AMD accelerators have already moved to it, and so has Meta’s MTIA 400, per TrendForce (18 September 2026)[4].
- The alternative is Intel’s EMIB-T: 15,000-20,000 wafers a month of CoWoS-equivalent capacity in 2027 and 40,000-45,000 in 2028, estimate (Economic Daily News, via TrendForce)[3]. Google is expected to move to EMIB-T in 2027, per TrendForce[4].
What this means for buyers
- New generations arrive on packaging’s schedule. The newest NVIDIA and AMD GPUs use CoWoS-L[4], and CoWoS capacity doubles only by the end of 2028[3], so volume deliveries of new-generation systems stay contested through 2027, our estimate.
- Installed capacity does not wait for packaging. A rack running in a data center today already has its chips; a rack ordered for 2027 waits in the CoWoS queue, our estimate.
- A narrower gap is an average. Demand still grows about 80% in 2027, estimate (Morgan Stanley)[2], and the tight variant is the one new GPUs need, our estimate.
Waiting for packaging to catch up means waiting for capacity that doubles only by 2028[3].
Method and sources
This page is one part of our review of AI compute supply bottlenecks, which ranks the constraints on AI compute supply now, in 2027 and in 2028. The other two topic pages: HBM and server memory in 2027 and AI data center power.
Figures in our facts registry were checked against their sources on 27 November 2026. Where only a retelling exists, the page names whose retelling it is. Analyst estimates and press reports carry their author’s name, so they are not mistaken for what the companies themselves said; our own judgment is marked “our estimate”.
Ancapex introduces companies that need reserved GPU capacity to the operators that have it. How we are paid is in our methodology.
Sources
- TSMC CoWoS Supply-Demand Gap Reportedly Seen Narrowing from 20% to 10% by End-2026 as Capacity Expands (TrendForce, 15 Jun 2026)
- Morgan Stanley, September revision of CoWoS demand (cnyes, 12 Sep 2026)
- TSMC Reportedly Targets 22% 2nm, 16%+ 3nm Capacity Boost by Mid-2027; CoWoS to Double by 2028 (TrendForce, 14 Sep 2026)
- TrendForce: CoWoS-L and EMIB-T in AI accelerators (press release, 18 Sep 2026)
- After TSMC's 3Q26 Earnings: Key Brokerage Takeaways as 2028 Capex Forecasts Reach US$105B (TrendForce, 16 Oct 2026)
- TSMC Says CoWoS Offers Industry's Largest Packaging Amid Intel EMIB Rivalry; CoPoS Advances (TrendForce, 16 Apr 2026)
- TSMC, Q3 2026 quarterly results
- Morgan Stanley: AI Supply Chain, Prelim 2028 AI semis vs. CSP capex growth (Zhitong via Webull)
- Morgan Stanley on CoWoS demand (AiCoin)
- Morgan Stanley Report: CoWoS Demand to Double by 2027, Driven by AMD and ASICs in AI Chip Growth (KuCoin)
- NVIDIA's CoWoS AI Chip Packaging Demand To Be Foreshadowed In 2027 By AMD Due To Agentic AI CPU Ramp, Says Morgan Stanley (Wccftech)
- Advanced Packaging Demand Soars: Nvidia Secures 60% of CoWoS Capacity (Astute Group)
- Morgan Stanley on CoWoS demand, June version (CLS, 25 Jun 2026)
- CoWoS allocation by customer, 2026-2027 (36Kr, 13 Jul 2026)
- Google begins allocating TPU orders; is AMD poised to take business from Broadcom? (moomoo)