Reserved GPU capacity

B200 GPU rental

Reserved HGX B200 capacity · Updated 19 October 2026
By , Co-Founder of Ancapex

As of 19 October 2026, B200 in our offers can start from Q4 2026. Ask us for current B200 terms. We have too few priced B200 offers to publish rates; ask us for current quotes.

Ancapex reserves B200 capacity for AI teams. We collect B200 offers from operators, bring them to a comparable basis and agree the price and terms with you. You sign directly with the operator.

Book a call → Send a request

B200 availability

Operators with current offers3
Can startFrom Q4 2026
RegionsSeveral regions
Typical termAsk us

When B200 is enough

B200 is the first Blackwell data-center GPU; B300 is the Blackwell Ultra step up. Per 8-GPU server, B200 has 1.4 TB of HBM3e against 2.1 TB on B300, and half the network bandwidth: 0.8 TB/s against 1.6 TB/s (NVIDIA specifications). If your model and batch fit in that memory, B200 is enough, and on public price lists it costs less per hour.

GPU
NVIDIA B200 (Blackwell), in HGX B200 servers with 8 GPUs
Memory
1.4 TB of HBM3e per 8-GPU server
NVLink
1.8 TB/s GPU-to-GPU, 14.4 TB/s per server
Network
Up to 0.8 TB/s per server; Ethernet or InfiniBand, depending on the operator
Terms
Reserved; terms on request

What to compare before you sign

Two quotes at the same price per GPU-hour are rarely the same price. Before any match we bring every offer to the same eight lines:

How it works

  1. Send a request: GPU type, quantity, region, start date, term and workload.
  2. We qualify the request and match it with operators that have the capacity.
  3. You get offers on a comparable basis, and we agree the price and terms with you.
  4. You sign directly with the operator.

We share the operator, the site and the exact price once the NDA and the referral agreement with the operator are signed and we have had a call with you.

Send a request

Requirements are handled confidentially and shared with operators only on a need-to-know basis, never with your name attached before you approve it. We reply within one business day from dima@ancapex.io.

FAQ

How fast can I get B200?

In current offers B200 can start from Q4 2026.

B200 or B300?

B300 has 50% more memory per server and twice the network bandwidth; B200 has far more FP64 and INT8. See B300 rental.

What terms are available for B200?

Ask us: with few B200 operators we do not publish their terms.

What does B200 cost to rent?

We publish rates once we have enough priced offers that no single operator's price shows through. Send a request and we share current quotes after an NDA.