As of 19 October 2026, B200 in our offers can start from Q4 2026. Ask us for current B200 terms. We have too few priced B200 offers to publish rates; ask us for current quotes.
Ancapex reserves B200 capacity for AI teams. We collect B200 offers from operators, bring them to a comparable basis and agree the price and terms with you. You sign directly with the operator.
| Operators with current offers | 3 |
|---|---|
| Can start | From Q4 2026 |
| Regions | Several regions |
| Typical term | Ask us |
B200 is the first Blackwell data-center GPU; B300 is the Blackwell Ultra step up. Per 8-GPU server, B200 has 1.4 TB of HBM3e against 2.1 TB on B300, and half the network bandwidth: 0.8 TB/s against 1.6 TB/s (NVIDIA specifications). If your model and batch fit in that memory, B200 is enough, and on public price lists it costs less per hour.
Two quotes at the same price per GPU-hour are rarely the same price. Before any match we bring every offer to the same eight lines:
We share the operator, the site and the exact price once the NDA and the referral agreement with the operator are signed and we have had a call with you.
Requirements are handled confidentially and shared with operators only on a need-to-know basis, never with your name attached before you approve it. We reply within one business day from dima@ancapex.io.
In current offers B200 can start from Q4 2026.
B300 has 50% more memory per server and twice the network bandwidth; B200 has far more FP64 and INT8. See B300 rental.
Ask us: with few B200 operators we do not publish their terms.
We publish rates once we have enough priced offers that no single operator's price shows through. Send a request and we share current quotes after an NDA.