Reserved GPU capacity

HGX B300 vs DGX B300: what differs, and what it means when you reserve

Guide · Updated 30 October 2026
By , Co-Founder of Ancapex

HGX B300 is NVIDIA's 8-GPU board that server makers such as Supermicro and Lenovo build their own B300 servers around; DGX B300 is NVIDIA's own complete server on the same eight GPUs. NVIDIA's product pages list the same GPU figures for both: 2.1 TB of GPU memory, 14.4 TB/s of NVLink and 108 PFLOPS of dense FP4, and both carry eight ConnectX-8 network cards. What differs is the server around them: who builds it, the CPU model, extra network cards, storage, cooling, software, support and price. Reserved through Ancapex on terms of two years or longer, an 8-GPU B300 server costs about $32,700 a month at the median rate of $5.60 per GPU-hour, our fee included (26 October 2026).

For a purchase, HGX against DGX is a choice of vendor and configuration. For a reservation it is a line to check in the quote: the operator owns the servers, and you rent GPU-hours on them.

Book a call → Send a request

The same eight GPUs

SpecHGX B300DGX B300
GPUs8 Blackwell Ultra SXM8 Blackwell Ultra SXM
GPU memory2.1 TB2.1 TB
NVLink, total14.4 TB/s14.4 TB/s
FP4 Tensor, sparse / dense144 / 108 PFLOPS144 / 108 PFLOPS
FP8 Tensor, sparse72 PFLOPS72 PFLOPS

Sources: NVIDIA HGX and NVIDIA DGX B300 product pages. The DGX B300 user guide, Lenovo and Supermicro give 288 GB per GPU, 2.3 TB per server; all GPU specs are on B300 specs.

What differs

 HGX B300 serversDGX B300
Who builds itServer makers on NVIDIA's HGX board, each with its own modelsNVIDIA
CPUsTwo Intel Xeon 6700-series, the model picked from the maker's list (Lenovo's SR680a V4 list includes the 6776P)Two Intel Xeon 6776P
Network cardsEight ConnectX-8 SuperNICs at up to 800 Gb/s; Supermicro's SYS-822GS-NB3RT adds up to two north-south cards of your choiceEight ConnectX-8 at up to 800 Gb/s, plus two BlueField-3 DPUs at up to 400 Gb/s
Cooling and sizeAir-cooled 8U (Supermicro SYS-822GS-NB3RT) or direct-to-chip liquid in 4U (Supermicro SYS-422GS-NB3RT-LCC)Air-cooled, 10U
PowerSet by the build; each B300 GPU is rated up to 1,100 W in Lenovo's serverAbout 14 kW (product page); 14.5 kW, 15 kW system maximum (user guide)
SoftwareThe maker's and the buyer's choiceDGX OS included; NVIDIA AI Enterprise and Mission Control recommended
SupportFrom the server makerThree-year business-standard support from NVIDIA
PriceSupermicro's store lists SYS-822GS-NB3RT from $545,173.05; Lenovo gives $785,606.50 as the usual price of its SR680a V4 with eight B300 (15 June 2026)No list price from NVIDIA; its page sends buyers to partners and a sales contact. Reported prices: B300 price

Sources: NVIDIA DGX B300, DGX B300 user guide, NVIDIA data-center guide for DGX B300 (air cooling), NVIDIA HGX, Supermicro SYS-822GS-NB3RT, Supermicro SYS-422GS-NB3RT-LCC, Supermicro store, Lenovo SR680a V4, Lenovo TCO paper; seen 30 October 2026.

Which one to buy

DGX B300 is NVIDIA's own design, with NVIDIA's software and support behind it. HGX B300 servers let you pick the maker, the CPUs, storage, liquid or air cooling and the support contract; a 4U liquid-cooled server takes less than half the rack space of a 10U one. What a server costs to buy and to run, and when reserving costs less: B300 price.

What it means when you reserve

19 operators in our pipeline have current B300 offers (26 October 2026). On terms of two years or longer, reserved B300 costs about $5.60 per GPU-hour at the median, middle half $5.30 to $6.50 (11 priced offers from 8 operators), our fee included. For eight GPUs over a month of 730 hours that is about $32,700. Current start dates are on GPU availability.

The rate is per GPU-hour for the block, so ask which server stands behind it:

We ask operators whether they can cover your request without naming you, and introduce you to up to three. Price and terms come from the operator, and the operator pays our fee.

Send a request

Get offers for B300. Three fields, nothing else to fill in.

Requirements are handled confidentially. Your name stays with us until the operator signs our NDA and referral agreement. We reply within one business day from dima@ancapex.io.

FAQ

What is the difference between HGX B300 and DGX B300?

HGX B300 is NVIDIA's 8-GPU board that server makers build their own servers around, with their own choice of CPU model, cooling and support. DGX B300 is NVIDIA's complete server on the same GPUs, with two Intel Xeon 6776P, two BlueField-3 DPUs, DGX OS and NVIDIA support.

Is DGX B300 faster than an HGX B300 server?

NVIDIA's product pages list the same GPU figures for both: 2.1 TB of GPU memory, 14.4 TB/s of NVLink and 144 PFLOPS of sparse FP4 (108 dense). Differences come from the server around the GPUs: CPU model, storage, cooling and software.

Is DGX B300 liquid-cooled?

No. NVIDIA's data-center guide describes DGX B300 as air-cooled, in 10 rack units. Some HGX B300 servers use direct-to-chip liquid cooling, for example Supermicro's 4U SYS-422GS-NB3RT-LCC.

Which CPUs do HGX B300 servers use?

Two Intel Xeon 6700-series processors in Supermicro's SYS-822GS-NB3RT and Lenovo's SR680a V4, the model picked from the maker's list. DGX B300 has two Intel Xeon 6776P, which is also on Lenovo's list.

What does it cost to reserve an 8-GPU B300 server?

About $32,700 a month for eight GPUs at the median of $5.60 per GPU-hour on terms of two years or longer, our fee included (26 October 2026).